Building contractPage 1 of 8
Agreement for building works
Surrey extension
This agreement is made on the date it is signed.
Parties
(1) of (“the Contractor”).
(2) of (“the Homeowner”).
Background
A. The Homeowner wishes to have a rear extension built at the property.
B. The Contractor has agreed to carry out that work on these terms and the project proposal.
Agreed terms
1. Documents and standard of work
1.1 The Contractor shall carry out and complete the works in a proper and workmanlike manner, with suitable materials, and in line with this contract, the project proposal and the attached drawings.
1.2 Those documents are to be read together. If they differ, the later document that both parties have agreed prevails.
1.3 The Contractor shall meet the Building Regulations and any planning permission that applies, and shall leave the working area tidy at the end of each day.
2. Price and payment
2.1 The contract sum is £48,000.00, being the total of the stage amounts in the project proposal.
2.2 The Homeowner pays each stage through Fort. The amount of a stage is the amount stated for it in the proposal.
2.3 Funds for a stage are secured before work on that stage starts, and are released when the agreed stage is complete.
2.4 A stage may include substages. A single payment cannot be more than £10,000, and a stage or substage cannot last longer than 45 days from the date its funds are secured.
3. Time, access and changes
3.1 The Contractor shall not start a stage until its funds are secured. The Homeowner shall give access at reasonable times.
3.2 No change to the works, the price or the time is to be carried out unless the Homeowner has agreed it. An agreed change is recorded on the project and forms part of this contract.
4. Completion and defects
4.1 A stage is complete when the work described for it in the proposal has been done. The Homeowner shall not withhold agreement for minor items that do not affect use.
4.2 The Contractor shall put right defects in a completed stage that the Homeowner reports within six months of that stage being released, and that are due to workmanship or materials.
5. Law
5.1 This contract is governed by the law of England and Wales. The parties shall try to settle a disagreement from the project record before either starts proceedings.
Continued on page 2