Updated 9 November 2026
Do I Need Planning Permission for a House Extension in England?
Find out if your extension needs planning permission in England: 2026 permitted development size limits, 6m/8m prior approval, conservation areas and fees.
Planning permission for a house extension is not always required in England. Many single-storey extensions can be built under permitted development rights, provided they meet specific limits on size, height and position.
However, the rules are more restrictive for some types of property and in certain locations. Previous extensions, planning conditions, conservation area status and local restrictions can all affect what you are allowed to build.
The short answer: a single-storey rear extension of up to 3 metres (semi-detached or terraced) or 4 metres (detached), no more than 4 metres high, can usually be built without planning permission. Single-storey rear extensions of up to 6 or 8 metres need prior approval from the council. Two-storey side extensions need planning permission, and the rules are tighter in conservation areas, National Parks and National Landscapes. A householder planning application costs £548 in 2026.

Photo: habiloid, CC BY-SA 2.0, via Geograph and Wikimedia Commons.
Before committing to designs or appointing a builder, it is worth establishing whether your extension needs planning permission, prior approval or neither.
This guide explains the rules in England, including the permitted development limits, the circumstances in which an application is needed and how to check the position for your property. If you're still working out a budget, see our guide to the average cost of a home extension in the UK.
Do I need planning permission for a house extension?
You may not need planning permission if your proposed extension falls within the permitted development rights set out in the Town and Country Planning (General Permitted Development) (England) Order 2015.
These rights allow certain improvements and extensions to be carried out without a full planning application. They are subject to strict conditions, however, and every relevant requirement must be met.
For a typical house outside a protected area, the main permitted development limits are:
| Type of extension | General permitted development limit |
|---|---|
| Single-storey rear extension | Up to 4 metres for a detached house, or 3 metres for any other house |
| Larger single-storey rear extension | Up to 8 metres for a detached house, or 6 metres for any other house, subject to prior approval |
| Single-storey side extension | Must be no more than 4 metres high and no wider than half the original house |
| Two-storey rear extension | No more than 3 metres beyond the original rear wall, and at least 7 metres from the boundary opposite that wall |
| Two-storey side extension | Not permitted development, so planning permission is required |
Source: GOV.UK, Permitted Development Rights for Householders: Technical Guidance.
These are the headline limits, not a guarantee that a particular extension qualifies. Other conditions apply, and the larger rear extension route is not available everywhere.
The rules are set out in Part 1 of Schedule 2 of the 2015 Order and explained in the government's technical guidance for householders.
How big can an extension be without planning permission?
The permitted development rules depend on where the extension is positioned and how many storeys it has.
Single-storey rear extensions
A single-storey rear extension can generally extend beyond the original rear wall by:
- 4 metres for a detached house.
- 3 metres for a semi-detached or terraced house.
The extension must not exceed 4 metres in height. Where it is within 2 metres of a boundary, its eaves height must not exceed 3 metres.
These limits apply to the distance measured from the original rear wall of the house, not necessarily the wall of an existing extension.
For example, if a previous owner built a 2-metre rear extension, you cannot simply measure a further 4 metres from that extension and assume the new work qualifies. The existing and proposed enlargement may need to be considered together.
Can I build a 6m or 8m extension without planning permission?
There is a separate route for larger single-storey rear extensions.
Under this route, the maximum distance beyond the original rear wall increases to:
- 8 metres for a detached house.
- 6 metres for a semi-detached or terraced house.
This is often called the larger home extension or prior approval route.
You must notify your local planning authority before starting work. The council will consult adjoining neighbours. If an adjoining neighbour raises an objection, the council must consider the effect of the proposal on the amenity of neighbouring properties and decide whether prior approval is required and can be granted.
This is not the same as having unrestricted permission to build an 8-metre or 6-metre extension. The other permitted development conditions still apply, and the route is not available in certain designated areas or on Sites of Special Scientific Interest. The Planning Portal's prior approval guidance explains the process.
Can I build a side extension without planning permission?
A side extension may qualify as permitted development if it:
- Is no more than one storey.
- Is no higher than 4 metres.
- Is no wider than half the width of the original house.
There are additional restrictions on extensions in front of the principal elevation. A side extension facing a highway can also be subject to restrictions.
In designated land, including conservation areas and National Parks, extensions beyond a side wall are not permitted development.
Two-storey rear extensions
The rules for two-storey extensions are considerably tighter.
To qualify as permitted development, a rear extension with more than one storey must not:
- Extend more than 3 metres beyond the original rear wall.
- Be within 7 metres of a boundary opposite that rear wall.
Other conditions apply, including restrictions on the roof and upper-floor side windows. Side extensions with more than one storey generally require planning permission.
These measurements can become complicated where a property has an irregular layout, several rear walls or existing extensions. It is worth having the plans checked rather than relying on a basic measurement from the current back wall.
What other conditions apply to permitted development?
Meeting the depth limit alone is not enough. There are wider conditions that apply to most extensions under permitted development rights.
For example:
- The extension must not be higher than the highest part of the existing house's roof, or have eaves higher than the existing eaves.
- Where the extension is within 2 metres of a boundary, the eaves must not exceed 3 metres.
- No more than half the relevant land around the original house can be covered by buildings, including extensions and other structures.
- Materials used for external work must have a similar appearance to those on the existing house.
- The extension must not project beyond the principal elevation or, where it faces a highway, the relevant side elevation.
- Verandas, balconies and raised platforms are not covered by these extension rights.
The rules also take account of previous development. An extension built by a previous owner can affect the space available for a new one.
What does 'original house' mean?
The permitted development rules refer to the original dwellinghouse.
This means the house as it was originally built, or as it stood on 1 July 1948 if it was built before that date.
It does not necessarily mean the property as it looks today. Previous extensions and alterations may affect the permitted development allowance remaining.

Photo: Roger Kidd, CC BY-SA 2.0, via Geograph and Wikimedia Commons. Terraces like these in Brockmoor, West Midlands, often already have a single-storey rear extension, which counts against the permitted development allowance.
This is particularly important when buying a property that has already been extended. Check the planning history before assuming there is room to extend it further.
Does the type of property matter?
Yes. The standard householder permitted development rights for extensions apply to houses, not flats or maisonettes.
A ground-floor flat, for example, does not normally benefit from the same rights to build a rear extension as a house. Planning permission will generally be required.
There are also exceptions for certain houses created through permitted development changes of use or built under specific permitted development provisions.
The first step should therefore be to establish whether your property actually qualifies for the householder permitted development rights you intend to rely on.
Do conservation areas and other protected locations have different rules?
Yes. Some locations have additional restrictions because of their architectural, historic or environmental importance.
The main categories include:
- Conservation areas.
- National Parks.
- National Landscapes, formerly known as Areas of Outstanding Natural Beauty.
- The Broads.
- World Heritage Sites.
- Sites of Special Scientific Interest, for certain permitted development rules.
These designations do not all operate in exactly the same way, so it is important to check the rules that apply to the specific property.
For example, on designated land such as a conservation area or National Park, side extensions and rear extensions of more than one storey are not permitted development under the standard householder rules. External cladding is also restricted. The larger 6-metre and 8-metre rear extension route is not available in these areas.
A conservation area does not automatically mean that every possible extension needs planning permission. Some smaller works may still qualify, but the permitted development tests are more restrictive.
What if my property is listed?
Listed buildings need particular care.
Listed Building Consent is separate from planning permission. It is required for works that would affect the building's character as a building of special architectural or historic interest.
This can apply to alterations or extensions, even where the work might otherwise fall within permitted development rights. The listing can also cover the interior and certain structures within the property's grounds.
Carrying out work that requires Listed Building Consent without obtaining it is a criminal offence.
Contact the local planning authority before proceeding with an extension to a listed building. The government's guidance on conserving and enhancing the historic environment explain how the system works.
Can I extend a house in the Green Belt?
Being in the Green Belt does not automatically prevent you from extending your home.
Permitted development rights can still apply, provided the relevant conditions are met and no other restriction removes them.
Where planning permission is required, the proposal will be assessed against Green Belt policy as well as the local development plan. The National Planning Policy Framework allows certain extensions and alterations to existing buildings where they would not result in a disproportionate increase in size compared with the original building, subject to the policy's other requirements.
The size, design and circumstances of the proposal matter. There is no single extension allowance that applies to every Green Belt property.
Can a local council remove permitted development rights?
Yes. A local planning authority can remove specified permitted development rights in a defined area through an Article 4 Direction.
It may also have removed rights through a condition attached to an earlier planning permission for the property.
An Article 4 Direction does not necessarily remove every permitted development right. It withdraws the specific rights identified in the direction, which means you need to check the wording and the area it covers.
This is one reason why two houses with almost identical layouts can have different planning requirements.
Before relying on permitted development, check:
- Whether your property is covered by an Article 4 Direction.
- Whether an earlier planning permission removed or restricted permitted development rights.
- Whether the property is subject to any relevant planning conditions.
Your local planning authority should be able to confirm whether any restrictions apply.
If planning permission is required, what will the council consider?
If your extension falls outside permitted development, you will usually need to submit a householder planning application.
The application will be assessed against the relevant development plan and national planning policies. The local planning authority will also consider the design and circumstances of the individual proposal.
The current National Planning Policy Framework, published in August 2026, includes national decision-making policies on design and development. It expects proposals to respond appropriately to their context, including the character of the site and its surroundings.
In practice, the council may consider:
Scale and appearance
Does the extension look appropriate alongside the existing house? Its proportions, roof shape, materials and relationship with the original building may all matter.
Impact on neighbours
Could the extension cause unacceptable overlooking, loss of privacy, overshadowing or an overbearing effect on neighbouring properties?
The street and surrounding area
Would the extension fit the character of the street or wider area? This can be particularly important where the property is in a conservation area or another sensitive location.
Local design guidance
Many councils publish design guides, supplementary planning documents or design codes covering residential extensions. These can contain specific guidance on building lines, roof forms, materials, spacing and the relationship between neighbouring properties.
This is where the council you live in becomes important. National permitted development rules apply across England, but local planning policies and design guidance differ. For an example of how much local guidance can vary, see our guide to planning permission for house extensions in Surrey, which covers the design guidance published by Surrey's 11 councils.
It is worth reading your council's householder extension guidance before finalising the design. A proposal can meet the basic size requirements and still be refused if planning permission is required and its design or impact is considered unacceptable.
How do I check whether my extension needs planning permission?
Before starting work, work through the following checks.
1. Find your local planning authority
The relevant council is normally the local planning authority responsible for your address. You can find it using the Planning Portal's local authority search.
2. Check the property's planning history
Look for previous planning applications, approved plans and conditions. Pay particular attention to any restrictions on permitted development rights.
3. Check the property's designation
Confirm whether the house is in a conservation area, National Park, National Landscape, World Heritage Site or other protected area. Check whether an Article 4 Direction applies.
4. Measure from the original house
Use the original house plans where possible. Do not assume the current rear wall is the correct starting point for measuring an extension. Include previous extensions when checking the cumulative limits.
5. Read the council's design guidance
If planning permission is likely to be needed, check the local design guide and development plan. This can help identify potential issues before money is spent on detailed drawings.
6. Consider a Lawful Development Certificate
If the extension appears to qualify as permitted development, you can apply for a Lawful Development Certificate to obtain formal confirmation from the council.
It is not compulsory, but it provides written evidence that the proposed development is lawful for planning purposes, provided it is built in accordance with the certificate.
This can be useful when selling the property, as buyers and their solicitors may ask for evidence that an extension did not require planning permission.
A certificate is not a substitute for Building Regulations approval or any other required consent.
How much does a house extension planning application cost?
As of 1 April 2026, the standard fee for a householder planning application to extend or alter a single dwellinghouse in England is £548, up from £528.
| Application | Fee from 1 April 2026 |
|---|---|
| Householder planning application (one house) | £548 |
| Prior approval for a larger single-storey rear extension | £249 |
Source: GOV.UK, Planning fees: annual indexation from 1 April 2026. Fees in Wales are different.
This is the application fee, not the total cost of preparing a planning application. You may also need to pay for drawings, surveys, professional advice or other supporting documents. Our guide to the hidden costs of home renovation covers the fees and extras that are easy to miss when budgeting.
How long does planning permission take?
A standard householder planning application should normally be decided within 8 weeks of the local planning authority validating it.
The validation date matters. The council may need to request missing documents or information before the application is considered valid, which can delay the start of the formal determination period.
The larger home extension prior approval process follows a different timetable and neighbour consultation procedure, with a 42-day determination period.
These are standard determination periods, not guarantees that every application will be resolved within that time. More complicated proposals or agreed extensions of time can take longer.
Do I need Building Regulations approval as well?
Planning permission and Building Regulations approval are separate requirements.
Planning permission deals with whether the development is acceptable in planning terms, including its size, appearance and impact on the surrounding area.
Building Regulations deal with how the extension is constructed. This includes matters such as:
- Structural safety and foundations.
- Fire safety.
- Insulation and energy efficiency.
- Drainage.
- Ventilation.
- Electrical safety.
Most house extensions require Building Regulations approval, even where planning permission is not needed.
You should establish the Building Regulations requirements before construction begins. Depending on the work, approval may be dealt with through the local authority's building control service or a registered building control approver.
Do I need to tell my neighbours?
There is no general requirement to obtain your neighbours' permission simply because you are building an extension.
However, the Party Wall etc. Act 1996 may apply to certain types of work. This includes building on or at the boundary, carrying out work to an existing party wall, or excavating near and below a neighbouring building's foundations.
Where the Act applies, you may need to serve formal notice on the adjoining owner.
This is separate from planning permission and Building Regulations. Having approval from the council does not remove your responsibilities under the Party Wall Act.
How Fort can help with your extension project
Planning permission is only one part of organising a successful extension. Once the design and approvals are in place, the work still needs to be agreed, documented and managed properly.
Fort gives homeowners and tradespeople a shared place to organise residential building projects. You can find and connect with vetted tradespeople, agree the proposed work, record project stages and keep important information in one place. Before you appoint anyone, our guides on how to vet a builder and how to compare builder quotes are worth a read.
Fort also supports milestone-based payments, allowing project funds to be secured before work progresses and released following the agreed approval process. Read more on how milestone payments protect homeowners.
Whether you are planning a new extension or already have a builder working on your home, Fort helps make the arrangements clearer for everyone involved.
Find out how Fort works for homeowners, or create your Fort account.
Sources and further guidance
The main official sources used for this guide are listed below. Planning rules can change, so check the latest guidance and your property's planning history before relying on permitted development rights. This guide covers England only; Wales, Scotland and Northern Ireland have their own rules.
Last reviewed: November 2026.
Frequently asked questions
- Not necessarily. A small extension may qualify as permitted development, provided it meets all the relevant size, height, position and other conditions. Check the property's planning history and any local restrictions before starting.
- For a house in England, a single-storey rear extension can generally project up to 4 metres beyond the original rear wall of a detached house, or 3 metres for other houses, and be no more than 4 metres high. A single-storey side extension can be up to half the width of the original house. With prior approval, a single-storey rear extension can go up to 8 metres (detached) or 6 metres (other houses).
- A single-storey rear extension of up to 3 metres beyond the original rear wall may qualify as permitted development for a semi-detached or terraced house. A detached house generally has a 4-metre limit. Other restrictions still apply.
- Potentially. A single-storey rear extension can extend up to 6 metres for a semi-detached or terraced house, or 8 metres for a detached house, under the larger home extension prior approval route. You must notify the local planning authority, pay the £249 prior approval fee and comply with the relevant conditions.
- A neighbour cannot automatically prevent an extension simply by objecting. However, objections can be relevant to the council's assessment, particularly under the larger home extension prior approval process. Where full planning permission is required, the council considers representations alongside planning policy and other material considerations.
- Not for every type of extension. However, permitted development rights are more restricted in conservation areas. Side extensions and rear extensions of more than one storey are among the types of work that generally need planning permission in these areas.
- A conservatory is generally assessed under the same householder permitted development rules as other single-storey extensions. Its size, position, height and the property's planning restrictions still matter.
- Possibly. Green Belt status does not automatically remove permitted development rights. However, if the extension needs planning permission, Green Belt policy will be relevant to the decision.
- From 1 April 2026, the fee for a householder planning application to extend or alter a single house in England is £548. Prior approval for a larger single-storey rear extension costs £249. Drawings, surveys and professional advice are extra.
Do I need planning permission for a small house extension?
How big can an extension be without planning permission?
Can I build a 3-metre rear extension without planning permission?
Can I build a 6-metre rear extension without planning permission?
Can my neighbour stop my extension?
Does being in a conservation area mean I need planning permission?
Do I need planning permission for a conservatory?
Can I extend my house without planning permission if it is in the Green Belt?
How much does a planning application for an extension cost in 2026?